CI/CD is the practice of building, testing and releasing software through an automated pipeline: continuous integration merges and tests every code change, continuous delivery prepares it for production behind a manual approval, and continuous deployment releases it with no approval at all. For an Indonesian bank, insurer or multifinance company, the model easiest to defend in front of an OJK examiner is continuous delivery with a recorded, independent approval. Neither POJK 11/POJK.03/2022 nor PADK 1 Tahun 2026 (in force since 1 March 2026) mentions pipelines, DevOps or continuous deployment even once. What they require is authorisation before a change, testing in a separate environment, segregation of duties, and an audit trail over all IT activity.
This piece is written for heads of compliance, IT risk managers and internal audit (SKAI, the satuan kerja audit intern), with the CIO or CTO as second reader. It also suits a regional engineering team whose pipeline is designed outside Indonesia but ships to an OJK-supervised entity. The question isn't "what is CI/CD". It's whether an OJK-supervised institution may automate its releases, and what evidence the pipeline has to leave behind.
CI, continuous delivery and continuous deployment: where the button sits
The three get written as one acronym. To an examiner the difference comes down to a single step: who decides that a change goes to production.
| Practice | What is automated | Approval before production |
|---|---|---|
| Continuous integration (CI) | Build and test on every commit | Doesn't reach production |
| Continuous delivery | Build, test, a release package ready to install | Yes, by a person |
| Continuous deployment | The whole path to production | None |
One correction to the tutorials in circulation: CI/CD doesn't make software bug-free. A pipeline only runs the tests you wrote. And a sample pipeline that deploys straight to an environment called production with no reviewer is continuous deployment, whatever the article calls it.
What OJK actually regulates for system changes
All the texts below are published in Indonesian only. Quotations are given in the original, followed by our English rendering. When you cite them in a policy, cite the Indonesian.
Commercial banks: POJK 11/POJK.03/2022 and PADK 1 Tahun 2026
POJK 11/POJK.03/2022 on the Implementation of Information Technology by Commercial Banks was enacted on 6 July 2022 and promulgated on 7 July 2022. It works at the level of principle: the phrase "manajemen perubahan" (change management) doesn't appear in it at all. Three articles do the anchoring:
- Article 53(2)(c) requires an internal control system covering "kegiatan pengendalian dan pemisahan fungsi" (control activities and segregation of functions).
- Article 54(2) requires the bank to ensure an audit trail is available "atas seluruh kegiatan penyelenggaraan TI" (over all IT operating activities) for supervision, verification, testing and other examination.
- Article 56 sets the sanctions. After a written warning, a bank that still hasn't complied with Article 53(1) or 54(2) can be barred from launching new products, have specific business activities frozen, or have its governance factor rating lowered in its soundness assessment.
The detail now sits in PADK 1 Tahun 2026 on the Implementation of Information Technology by Commercial Banks, a regulation of a member of OJK's Board of Commissioners, enacted on 23 January 2026 and in force from 1 March 2026. Its Article 4 revokes SEOJK 21/SEOJK.03/2017. So a change policy that still cites the 2017 circular is citing a document that no longer applies.
Annex I, Chapter II.C.3.d of PADK 1/2026 sets the minimum content of a change-management policy:
Bank harus memiliki kebijakan, standar, dan prosedur manajemen perubahan yang mencakup paling sedikit permintaan, analisis, persetujuan perubahan, dan instalasi perubahan termasuk pemindahan perangkat keras dan perangkat lunak dari lingkungan pengujian ke lingkungan operasional.
In English: the bank must have change-management policies, standards and procedures covering at least the request, the analysis, the approval of the change, and its installation, including moving hardware and software from the test environment to the operational one.
The same section lists four steps: review and authorisation before modification; testing in a separate environment; a backup of data and source code before modification; and documentation. The documentation records what was changed, its date and time, the systems, databases and work units affected, the resources needed, security and reliability considerations, the implementation procedure and a post-change evaluation. The minimum standard must cover "risiko, pengujian, otorisasi dan persetujuan, waktu implementasi, validasi setelah penginstalan, dan back-out atau recovery": risk, testing, authorisation and approval, implementation timing, post-installation validation, and back-out or recovery. Every change must also pass an oversight function that brings in the business unit, IT, information security and internal audit.
On segregation of duties, Chapter II.A.2.b.3) gives a concrete example: the staff who act as security administrator and who are responsible for IT development must be different people from the staff who run IT operations. Chapter II.C.2 adds separation of the development and production environments, and control over the conversion of source code into the object code that gets installed.
Insurers, multifinance and other non-bank institutions: POJK 4/POJK.05/2021
POJK 4/POJK.05/2021 on Risk Management in the Use of Information Technology by Non-Bank Financial Institutions (LJKNB), promulgated on 17 March 2021, covers insurance, pension funds, finance companies (multifinance), pawnbroking, guarantee companies and P2P lending. Article 12(2)(e) requires "manajemen perubahan sistem Teknologi Informasi" (IT system change management). Article 18(2)(c) carries segregation of functions, and Article 19(1) the audit-trail obligation, worded the same way as the bank regulation.
SEOJK 22/SEOJK.05/2021, issued on 24 August 2021, is much thinner than the bank PADK. Point 23(b) only asks for change control "melalui fungsi pengawasan yang terkoordinasi" (through a coordinated oversight function), with no documentation list. Point 9 still asks for a UAT sign-off record approved by end users, and point 29 asks for logs to be protected from tampering and unauthorised access. The circular was still published on ojk.go.id as of 25 November 2026 and we haven't found a revocation, but check again before citing it in a policy.
ISO/IEC 27001:2022
For a certified institution, Annex A gives the same audit frame: controls 5.3 (segregation of duties), 8.25 (secure development life cycle), 8.31 (separation of development, test and production environments) and 8.32 (change management). How to test a vendor's certificate is covered in our ISO 27001 certification vendor check.
Automation isn't forbidden, and it can produce stronger evidence
PADK 1/2026 Chapter II.C.2 leaves the methodology to the bank: development "dapat dilakukan sesuai dengan kebijakan serta metodologi pengembangan TI yang dilakukan oleh Bank", that is, it may follow the bank's own IT development policy and methodology. The only passage that mentions automation, Chapter IX.A.1 on IT audit, actually assumes it exists:
Proses jejak audit harus dilaksanakan secara efektif dan didokumentasikan untuk memastikan bahwa proses automasi telah bekerja secara efektif dan akurat.
Roughly: the audit-trail process must be carried out effectively and documented, to make sure automated processes have worked effectively and accurately.
A manual release usually leaves a signed form and a few screenshots. From those, the examiner can't confirm that the code installed is the code that was approved. A pipeline with a system-enforced approval gate ties the approval to a specific artefact digest, timestamps it from a synchronised clock, and can't be skipped without leaving a trace. That's closer to the wording of Article 54(2) than a binder of forms.
One condition: every gate has to be configured for real, and its configuration history kept.
Control-to-artefact map
The table maps each PADK 1/2026 provision to an artefact an examiner can ask for. For non-bank institutions the equivalents are POJK 4/2021 Article 12(2) and SEOJK 22/2021 point 23, at a lower level of detail.
| Provision | Pipeline artefact | What the examiner asks for |
|---|---|---|
| II.C.3.d(1) review and authorisation before modification | Protected branch, mandatory review by someone other than the author | Pull-request history and reviewers |
| II.C.3.d(2), II.C.2(f) testing in a separate environment | Staging environment, test-job results | Test log per release, separate production credentials |
| II.C.3.d(3) backup of data and source code | Release tag, pre-deploy database snapshot job | Tag and snapshot for each release date |
| II.C.3.d(4) change documentation | Pull-request template, change ticket linked to the commit | Complete ticket, items a to g |
| Authorisation and approval, II.A.2.b.3) segregation of duties | Environment approval by an approver who isn't the committer | Approver's name vs the name that triggered the deploy |
| Source-to-object-code conversion (II.C.2) | Signed build, digest recorded at deploy | Approved digest matches the installed one |
| Back-out or recovery | Rollback job, previous artefact versions retained | Most recent rollback test |
| IV.B.1.c.5) c-f logging, retention, protection, time sync | CI/CD audit log exported to the SIEM, NTP-synchronised clocks | Immutable logs, retention period |
Read together, Chapters II.C.3.d(4) and IV.B.1.c.5) mean the pipeline log has to answer at least: who requested the change, who reviewed it, who approved it, the commit and build identity, the test results, the deploy time, the systems affected, the rollback path and the post-change evaluation. If the log can't answer one of those, someone will answer it from memory. That isn't evidence.
Three platform defaults that break segregation of duties
A platform's built-in approval gate doesn't automatically prove four-eyes control. GitHub's documentation on deployments and environments, read on 25 November 2026, says three things:
- One approver is enough. You can list up to six users or teams as required reviewers, but only one of them needs to approve for the job to proceed.
- Whoever triggers a deployment can approve it, unless "Prevent self-review" is switched on. With it on, the user who started the deployment can't approve it.
- Administrators can bypass the rules. By default, administrators can bypass protection rules and force a deployment to a given environment.
Check the plan as well. On GitHub Free, Pro and Team, required reviewers are only available for public repositories, so a bank's private repository on a Team plan has no environment approval gate at all. Other platforms have equivalent settings with different defaults. Ask for a configuration export and its change log, not a statement that "approval is in place".
Emergency changes go through the pipeline, not around it
PADK 1/2026 Chapter II.C.2 requires the bank to set a process for emergency changes. This is where examination findings usually surface: a hotfix goes straight onto the server, and the paperwork follows later or never. The same chapter also says that patching data directly during implementation should be avoided.
A defensible emergency path still runs through the same pipeline, with the differences written into the policy:
- a named, pre-appointed emergency approver, who still isn't the author of the change;
- a shortened minimum test set that is still logged;
- the change ticket completed and reviewed by the change-oversight function within a deadline the policy sets;
- a periodic count of emergency changes reported to risk management, because an emergency path used too often is a normal path that dodges the controls.
What about continuous deployment?
None of the OJK texts we read (POJK 11/2022, PADK 1/2026, POJK 4/2021 and SEOJK 22/2021) prohibits continuous deployment. None of the four uses the term. But PADK 1/2026 asks for "persetujuan perubahan" (approval of the change) and coordinated oversight of every change. Without an approval button, the bank has to show where that approval happens, for instance a class of pre-authorised changes defined in its own policy. The PADK text has no concept of a standard or pre-approved change, as ITIL would call it, so that argument is one the bank has to build and then defend in front of the examiner.
Our view: for any system that customer money passes through, continuous delivery is the defensible default. Continuous deployment is worth considering for components with no transactional impact, such as website content, under a written policy. The same logic already runs content approval. The CMS we built for BCA Group, used by its insurance, sharia and securities divisions' sites, was designed with drafts, preview, merge and multi-layer approval. That's content approval, not a code release, but the maker-checker logic is the same.
What compliance and internal audit should ask for
Before signing off on a vendor or an internal team proposing an automated pipeline, ask for:
- A change-management policy that cites PADK 1/2026 (or SEOJK 22/2021 for non-bank institutions), not SEOJK 21/2017.
- An export of the gate configuration: number of approvers, the self-review block, administrator-bypass status, and its change history.
- One complete sample release, from request to post-change evaluation, with the artefact digest matching at every stage.
- The list of emergency changes over the last 12 months and the evidence of their retrospective approval.
- Evidence that pipeline logs are stored outside the development team's control.
Put all five into the procurement documents; our guide to writing a terms of reference for a bank website or app shows where. The pipeline itself needs testing too, and that scope can be added to a penetration testing scope of work for banks. Any API shipped through it should already be on an API inventory with a named owner per API.
One deadline that matters this month: POJK 11/2022 Article 58(1) requires banks to report their IT development plan for the coming year by the end of November. If the 2027 plan includes release automation, update the change policy alongside it. To build an application whose pipeline leaves the evidence described above, see WEBARQ's cloud native application development service.








